Our projects
2015, Ukraine, Kryvyi Rih,
SEVGOK
Control panels.
2015, Ukraine, Mariupol,
MMK im. Iliyacha
Control power boards.
2015, Ukraine, Kryvyi Rih,
SEVGOK
Electric switchboards and benchboards.
2014, Ukraine, Zaporizhia,
Zaporizhstal
Central alarm display panel.
Motor control center switchboard.
2014, Ukraine, Kryvyi Rih,
YUGOK
Lighting panels.
2014, Ukraine, Donetsk,
Donetskstal
Supply of components, Rittal.
2014, Ukraine, Kryvyi Rih,
Heidelberg Cement Ukraine
Light panels.
Telecommunication cabinets.
2014, Ukraine, Kharkiv,
HTZ
Supply of components, Rittal.
2014, Ukraine, Dniprodzherzhinsk,
Dnieper Iron and Steel Works
Supply of components, Rittal.
2014, Ukraine, Mariupol,
Azovstal
Control panels.
2014, Ukraine, Kryvyi Rih,
Kryvbasszhelescom
DC boards.
2013, Ukraine, Zaporizhia,
Zaporizhstal
Electric switchgear.
Electric control boxes.
2013, Ukraine, Kryvyi Rih,
Heidelberg Cement Ukraine
Supply of components, Rittal.
2013, Ukraine, Yenakievo,
EMZ
Supply of components, Rittal.
2013, Ukraine, Nikopol,
Interpipe Niko Tube
Switchboards.
2013, Ukraine, Dniprodzherzhinsk,
Dnieper Iron and Steel Works
Transformers cooling control panels.
2013, Ukraine, Kryvyi Rih,
ArcelorMittal Kryviy Rih
Central alarm panels.
2011, Ukraine, Dniprozherzhinsk
Dnieper Iron and Steel Works
Aeration control switchboards.
2011, Ukraine, Zaporizhia
Zaporizhstal
Power shields.
Switchboards.
2010, Ukraine, Kryvyi Rih
ArcelorMittal Kryviy Rih
Lighting panels.
Power shields and cabinets.
2010, Ukraine, Dniprozherzhinsk
Dnieper Iron and Steel Works
DC shield.
2009, Ukraine, Zaporizhia
Energoautomation.
Transformer's cooling control panels.
2009, Ukraine, Kryvyi Rih
Heidelberg Cement Ukraine
Lighting panels.
2009, Ukraine, Dniprozherzhinsk
Dnieper Iron and Steel Works
Pumps control panels.
2009, Ukraine, Kryvyi Rih
ArcelorMittal Kryviy Rih
Technical re-equipment and modernization of the plant.
2008, Ukraine, Zaporizhia
Energoautomation
Various electrical components supply.
2008, Ukraine, Kryvyi Rih
ArcelorMittal Kryviy Rih
Technical re-equipment and modernization of the plant.
2008, Ukraine, Yenakievo
EMZ
Installation for supplying oxygen into the converter.
2008, Ukraine, Zaporizhia
Zaporizhstal
Speed control cabinets.
Operator control panels.
2007, Ukraine, Zaporizhia
Dniprospecstal
Air control panels.
2007, Ukraine, Kryvyi Rih
ArcelorMittal Kryviy Rih
Lighting panels and switchboards.
Modernization of electrical substation.
Power switchboards.
Control switchboards.
Modernization of Iron Ore refinery center.
Enrichment control panel.
2007, Ukraine, Dniprozherzhinsk
Dnieper Iron and Steel Works
Various electrical components supply.
Transformers cooling control panels.
2006, Ukraine, Yenakievo
EMZ
Hot-air units control switchboards.
Building, tooling and implantation of and electric control center.
2006, Ukraine, Dniprozherzhinsk
Dnieper Iron and Steel Works
Direct-current board 220.
Modernization of electrical substation.
Modernization of converter plant by means of building and implantation of two continuous casters and modernization of sludge pumping plant and more.
2005, Ukraine, Zaporizhia
Zaporizhstal
Power switchboards.
Control switchboards.
2004, Ukraine, Zaporizhia
Zaporizhstal
Heating boiler system control cabinets for a blast furnace.
Suction cleaning systems.
Charge-conveying boards.
Direct-current boards with “Schneider Electric” disconnect devices.
Operator control panel.
2004, Ukraine, Khmelnytskyi
Khmelnytska Nuclear Power Plant
Power transformers switchboards.
Power transformers motor drives.
Diagnostics and protection, environment assurance.
2002, Ukraine, Zaporizhia
Electrotechnology
Metal-cutting complex control board.
2001, Armenia, Tsarenzavan
Charentsavan instrument plant
Mechanical processing switchboards with full indication and measurement system of outbound parameters.